BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20120921T003000Z
DTEND:20120921T023000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Draft Environmental Impact Report - Foothill Extension from Azusa to Montclair
DESCRIPTION:Two public meetings scheduled to receive comments\n\n	The Draft Environmental Impact Report (EIR) for the proposed 12.3-mile Metro Gold Line light rail extension from Azusa to Montclair was released in August for a 45-day public review period. The proposed project runs mostly at-grade or street level\, and includes six stations (in Glendora\, San Dimas\, La Verne\, Pomona\, Claremont and Montclair) and two new grade-separated crossings.\n\n	\n\n	The Draft EIR can be found at each corridor city's public library\, the Construction Authority's office in Monrovia (address below)\, or online at: www.foothillextension.org.\n\n	\n\n	Two public meetings have been scheduled to receive comments on the Draft EIR:\n\n	\n\n	Thursday\, September 20\, 2012   5:30 p.m.\n\n	Montclair Senior Center\n\n	5111 Benito Street\n\n	Montclair\, CA\n\n	\n\n	Monday\, September 24\, 2012   5:30 p.m.\n\n	The Meeting House at Hillcrest\n\n	2705 Mountain View Drive\n\n	La Verne\, CA\n\n	\n\n	If you cannot attend either public meeting\, comments can also be received in writing by October 5\, 2012   the close of the comment period. Comments should be sent to:\n\n	 \n\n	Metro Gold Line Foothill Extension Construction Authority\n\n	ATTN: Lisa Levy Buch\, Director of Public Affairs\n\n	406 East Huntington Drive\, Suite 202\, Monrovia\, California 91016\n\n	Fax Number: 626-471-9048 or 626-471-9049\n\n	Email: llevybuch@foothillextension.org
X-ALT-DESC;FMTTYPE=text/html:<h2 style="text-align: center">\n	<strong>Two public meetings scheduled to receive comments</strong></h2>\n<p>\n	The Draft Environmental Impact Report (EIR) for the proposed 12.3-mile Metro Gold Line light rail extension from Azusa to Montclair was released in August for a 45-day public review period. The proposed project runs mostly at-grade or street level\, and includes six stations (in Glendora\, San Dimas\, La Verne\, Pomona\, Claremont and Montclair) and two new grade-separated crossings.<br />\n	<br />\n	The Draft EIR can be found at each corridor city&rsquo\;s public library\, the Construction Authority&rsquo\;s office in Monrovia (address below)\, or online at: www.foothillextension.org.<br />\n	<br />\n	Two public meetings have been scheduled to receive comments on the Draft EIR:<br />\n	<br />\n	<strong>Thursday\, September 20\, 2012 &ndash\; 5:30 p.m.</strong><br />\n	Montclair Senior Center<br />\n	5111 Benito Street<br />\n	Montclair\, CA<br />\n	<br />\n	<strong>Monday\, September 24\, 2012 &ndash\; 5:30 p.m.</strong><br />\n	The Meeting House at Hillcrest<br />\n	2705 Mountain View Drive<br />\n	La Verne\, CA<br />\n	<br />\n	If you cannot attend either public meeting\, comments can also be received in writing by October 5\, 2012 &ndash\; the close of the comment period. Comments should be sent to:<br />\n	&nbsp\;</p>\n<p style="text-align: center">\n	Metro Gold Line Foothill Extension Construction Authority<br />\n	ATTN: Lisa Levy Buch\, Director of Public Affairs<br />\n	406 East Huntington Drive\, Suite 202\, Monrovia\, California 91016<br />\n	Fax Number: 626-471-9048 or 626-471-9049<br />\n	Email: <u><span style="color: #0000ff"><a href="mailto:llevybuch@foothillextension.org">llevybuch@foothillextension.org</a></span></u></p>\n
LOCATION:Montclair Senior Center 5111 Benito Street Montclair\, CA
UID:e.838.3448
SEQUENCE:3
DTSTAMP:20260429T225051Z
URL:https://business.claremontchamber.org/events/details/draft-environmental-impact-report-foothill-extension-from-azusa-to-montclair-09-20-2012-3448
END:VEVENT

END:VCALENDAR
